GE Supplies Equipment for Gas Field Expansion

GE Oil and Gas has been selected by Total EandP UK to supply drilling and production equipment for the expansion of the Elgin Franklin gas field in the North Sea.

To meet the extreme well pressure and temperature demands of the project, GE is supplying surface wellhead and flow control equipment that can operate at well pressures of 15,000lb/in2 and temperatures of 450F (232C). In addition to the equipment, GE will provide field service installation, training and maintenance services for the project.

Comments

Popular posts from this blog

What is Class I Division 2?

FUSE SIZING CONSIDERATIONS FOR HIGHER EFFICIENCY MOTORS

7/8 16UN Connectors that Provide 600 Volts and 15 Amps